Izmir metro construction 2nd phase excavation productivity analysis


KUN M., AKSOY C. O., ONARGAN T.

20th International Mining Congress and Exhibition of Turkey (IMCET 2007), Ankara, Türkiye, 6 - 08 Haziran 2007, ss.327-332 identifier

  • Yayın Türü: Bildiri / Tam Metin Bildiri
  • Cilt numarası:
  • Basıldığı Şehir: Ankara
  • Basıldığı Ülke: Türkiye
  • Sayfa Sayıları: ss.327-332
  • Dokuz Eylül Üniversitesi Adresli: Evet

Özet

Metro lines, which require planning, design, construction, machinery-equipment selection and a rigorous operating procedure afterwards, are strong mass transport systems with capacities of 10000-40000 passengers/hour. Today, metro systems which are commonly preferred among confidential and economical mass transport systems, are becoming widely used in our country as in the world. In this study which is prepared for this purpose, performance analyses of excavation, support, injection and etc. works have been made regarding Izmir Metro 2nd Phase Construction. The obtained results have been interpreted together with the graphs and it was aimed to contribute both to the researches in similar studies and to provide efficiency for the studies in Izmir Metro 2nd Phase Construction.