2017 International Conference on Computer Science and Engineering (UBMK), Antalya, Türkiye, 5 - 08 Ekim 2017, ss.38-42
In this paper, studies on the assignment of the most suitable people to project teams have been developed and a model based on different calculated quality values under different needs has been created. An algorithm that builds a working set for the problem, heuristic algorithms that are intended to solve the problem sets at the best quality, and their comparison is presented.