Investigation of the effects on the buildings during the tunnel excavation by TBM for halkapi{dotless}nar-otogar project Halkapi{dotless}nar-otogar projesi i̇çin tbm tarafi{dotless}ndan tünel kazi{dotless}si{dotless} si{dotless}rasi{dotless}nda yapi{dotless}lar üzerine etkilerinin i̇ncelenmesi


ONARGAN T., AKSOY C. O., KÜÇÜK K., ÖZACAR V.

23rd International Mining Congress and Exhibition of Turkey, IMCET 2013, Antalya, Türkiye, 16 - 19 Nisan 2013, cilt.2, ss.1247-1257, (Tam Metin Bildiri) identifier

  • Yayın Türü: Bildiri / Tam Metin Bildiri
  • Cilt numarası: 2
  • Basıldığı Şehir: Antalya
  • Basıldığı Ülke: Türkiye
  • Sayfa Sayıları: ss.1247-1257
  • Anahtar Kelimeler: EPB-TBM, Shallow tunnel, Subsidence
  • Dokuz Eylül Üniversitesi Adresli: Evet

Özet

İzmir Light Rail Transit System (İZRAY) Halkapinar-Bus Station is scheduled to open within the scope of the HRS project, which will be driven in Neogene sediments of the excavation with the opening of the tunnel in case of EPB-TBM any potential damage to structures on earth were evaluated. In this study, the diameter of the bored tunnel will be opened according to the existing ground conditions and geotechnical structure, selection was carried out. Result of the analysis in question in the opening of the tunnel line will consist of a maximum of 7 meters diameter twin tunnels is determined to remain within the limits allowed deformations of the ground.