Limestone quarry quality optimization for a cement factory in Turkey


Onur A. H., Konak G., Karakus D.

JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, cilt.108, sa.12, ss.753-757, 2008 (SCI-Expanded) identifier identifier

Özet

Many factors govern the size and shape of an open pit, and these must be properly understood and used in the short and long-term planning of any open pit and quarrying operation. The importance of each factor will depend on the particular project, but the geology, grade, and localization of mineralization, extent of the deposit, topography, property boundaries, production rates, bench height, pit slopes, road grades, mining costs, and cut-off grades are key elements of open pits. This paper discusses the work done on the above parameters in order to provide an optimal production plan for a limestone quarry and clay deposits that provide raw material for a cement factory in Turkey.