TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, cilt.102, 1993 (SCI-Expanded, Scopus)
Two aspects of open-pit optimization that are often neglected are production scheduling and the incorporation of haul roads and safety berms in the design.