Project design of an open pit colliery in Terkidag, Turkey


Kose H., Pamukcu Ç., Yalcin E.

ACTA MONTANISTICA SLOVACA, cilt.15, sa.2, ss.109-120, 2010 (SCI-Expanded, Scopus) identifier identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 15 Sayı: 2
  • Basım Tarihi: 2010
  • Dergi Adı: ACTA MONTANISTICA SLOVACA
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus
  • Sayfa Sayıları: ss.109-120
  • Anahtar Kelimeler: Energy, open pit, production planning, optimization, engineering economics
  • Dokuz Eylül Üniversitesi Adresli: Evet

Özet

In this manuscript, first of all, the status of Turkey in terms of energy production and consumption is given and the need to rely on domestic sources, namely lignite deposits, is emphasized rather than importing fuels from abroad. Then, a thorough literature work concerning open pit design and production planning is explained in detail. On this basis, the project design and production planning of Tekirdag-Saray open pit colliery are conducted. According to the selected production technique, machinery-equipment that will be utilized in the coal winning system is determined and in the final part, the investment cost and unit production cost regarding the project are computed and the importance of constructing a power plant in the region operating with domestic fuels is expressed.