A priority based genetic algorithm approach for solving multiple alternative project scheduling problems with resource constraints and variable activity times


ÖZMEHMET TAŞAN S., Gen M.

2008 IEEE International Conference on Systems, Man and Cybernetics, Singapore, Singapore, Singapore, 12 - 15 October 2008

  • Publication Type: Conference Paper / Full Text
  • Doi Number: 10.1109/icsmc.2008.4811677
  • City: Singapore, Singapore
  • Country: Singapore
  • Dokuz Eylül University Affiliated: Yes