A priority based genetic algorithm approach for solving multiple alternative project scheduling problems with resource constraints and variable activity times


ÖZMEHMET TAŞAN S., Gen M.

2008 IEEE International Conference on Systems, Man and Cybernetics, Singapore, Singapore, Singapur, 12 - 15 Ekim 2008

  • Yayın Türü: Bildiri / Tam Metin Bildiri
  • Doi Numarası: 10.1109/icsmc.2008.4811677
  • Basıldığı Şehir: Singapore, Singapore
  • Basıldığı Ülke: Singapur
  • Dokuz Eylül Üniversitesi Adresli: Evet