Ö. Kılınçcı, "Assembly line balancing problem with resource and sequence-dependent setup times (ALBPRS)," JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY , vol.38, no.1, pp.557-570, 2023
Kılınçcı, Ö. 2023. Assembly line balancing problem with resource and sequence-dependent setup times (ALBPRS). JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY , vol.38, no.1 , 557-570.
Kılınçcı, Ö., (2023). Assembly line balancing problem with resource and sequence-dependent setup times (ALBPRS). JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY , vol.38, no.1, 557-570.
Kılınçcı, ÖZCAN. "Assembly line balancing problem with resource and sequence-dependent setup times (ALBPRS)," JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY , vol.38, no.1, 557-570, 2023
Kılınçcı, ÖZCAN. "Assembly line balancing problem with resource and sequence-dependent setup times (ALBPRS)." JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY , vol.38, no.1, pp.557-570, 2023
Kılınçcı, Ö. (2023) . "Assembly line balancing problem with resource and sequence-dependent setup times (ALBPRS)." JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY , vol.38, no.1, pp.557-570.
@article{article, author={ÖZCAN KILINÇCI}, title={Assembly line balancing problem with resource and sequence-dependent setup times (ALBPRS)}, journal={JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY}, year=2023, pages={557-570} }